Plattsmouth High School

Plattsmouth High School

This past week and a 1/2 has been a transformation week for the students and teachers at Plattsmouth High School. We started working with them early in the year, designing and constructing what would best suit their needs at the school. What we came up with along with their thoughts and ideas on paper, turned in to something amazing in real life!! There is so much going on in this room that I’m going to break it down into phases of installation so you can truly enjoy this project and so we don’t miss any of the sweet details that make this room as amazing as it is!!! A HUGE THANK YOU goes out the community of Plattsmouth, Nebraska for entrusting us with this project!!

So let’s get started!!! Like almost all of our room designs, we start with multiple 3D renderings of concepts that we can do with the room. We meet with coaches, staff, board members, etc. and present our thoughts and ideas to them and discuss what they like and don’t like. We walk them through the design so they can have an idea of what it would be like to be there inside that space. Once everyone agrees on a layout, we start the process. 

1st step to this room was getting the flooring installed! Our partners at The Floor Plan installed wall to wall rubber 1″ thick ultratile by Ecore, with 15 custom logo’d lifting platform inserts with the Devil Fork design. Down the center of the room we installed Speed and Agility turf also by Ecore. Once that was done, the NOVA Fitness Equipment team was ready to start the installation process!!